What’s at 4 Billion USD Project – Smart City in Dong Anh district?

Smart City Dong Anh Project

When the BRG–Sumitomo Smart City in Dong Anh was first announced in 2019, it was presented as a 4 billion USD new city that would transform the north bank of the Red River within a decade. Seven years later, the project has finally moved from ceremony to construction, but on a longer timeline and with several open questions. This update explains what the North Hanoi Smart City is, where it stands in late 2026, how it fits the Nhat Tan–Noi Bai corridor and Hanoi’s master plans, and what is already operating around it. It also separates what you can rely on today from what is still a plan.

What is the North Hanoi Smart City?

The project, officially the North Hanoi Smart City, is developed by North Hanoi Smart City Development Investment JSC, a joint venture between Vietnam’s BRG Group and Japan’s Sumitomo Corporation. It covers about 272 hectares in the former Hai Boi, Vinh Ngoc and Kim No communes of Dong Anh, with total investment of around 4.2 billion USD, which makes it one of the largest foreign-invested urban projects in Vietnam. Since Hanoi abolished its districts in July 2025, the site falls under the new commune-level units of the northern city; the 2025 groundbreaking was reported in Vinh Thanh commune.

The concept rests on six “smart” pillars: energy, mobility, governance, education, economy and living. The plans describe managed energy supply and storage, environmental monitoring of air and water quality, public transport links to central Hanoi, and digital services for residents. Its centrepiece is a planned 108-storey financial tower, reported at around 639 metres, which would be the tallest building in Vietnam if built as designed. All of this is still at design or early construction stage.

2019 concept rendering of the North Hanoi Smart City with its planned 108-storey tower and Nhat Tan Bridge behind

Location on the Nhat Tan–Noi Bai corridor

The site lies along Vo Nguyen Giap road, the expressway-style boulevard that runs from the north end of Nhat Tan Bridge to Noi Bai International Airport. This corridor has been operating since 2015 and is the fastest route between the airport and Tay Ho and the city centre. From the project, the West Lake area is a short drive across Nhat Tan Bridge, and the airport is to the north along the same road.

Earlier descriptions, including the first version of this article, placed the project on Vo Chi Cong road; that road is actually on the south side of the river, leading to Nhat Tan Bridge from the Tay Ho side. Under the Adjusted General Master Plan to 2045, this whole area belongs to the planned northern city around Dong Anh, Me Linh and Soc Son, intended as a services and international gateway hub anchored by the airport. We explain the wider framework in our guide to Hanoi urbanization planning and checking real estate projects.

Project timeline: from 2019 groundbreaking to construction

The first groundbreaking ceremony took place in October 2019, attended by the then Prime Minister, with completion promised by 2028. Progress then stalled for years over site clearance of land belonging to around 1,500 households and over planning adjustments. Hanoi handed the joint venture an adjusted detailed plan in July 2023 and formally announced implementation of the project in November 2023, yet reports in 2024 still described the site as largely under clearance, with no construction under way.

The key turning points came in 2025. Around mid-2025 the developer paid land use fees reported at close to VND 10,000 billion, and on 19 August 2025 the project broke ground again, on the same day that the nearby National Exhibition Center was inaugurated. The project is now divided into five phases, with the final phase scheduled for completion in the fourth quarter of 2032. In early 2026 a contractor was reported to have been appointed for phase 1 technical infrastructure.

Concept rendering of a planned central boulevard with a rail line in the Dong Anh Smart City

Where the Smart City stands in late 2026

According to reports from May 2026, the developer has completed the project’s legal procedures and financial obligations and received land use right certificates. At the same time, the joint venture asked the city to raise the planned resident population above the figure in the approved plan, arguing that the change is needed to make the project commercially viable. Hanoi’s leaders asked city agencies to answer the population question quickly and urged the developer to push ahead with construction once it is settled.

In practical terms, the status in late 2026 is under construction at an early, infrastructure stage. There are no completed homes, and we have not seen an official notice that residential units are eligible for sale. Treat any offer of “Smart City” apartments or land with caution until the developer formally launches sales with the documents required under the Law on Real Estate Business 2023. Design details, including the tower and population figures, may still change.

What is operating, under construction and planned around Dong Anh

The area around the Smart City has changed more since 2024 than in the previous decade, mostly because of Vingroup’s projects around Co Loa:

  • Operating: Nhat Tan Bridge and Vo Nguyen Giap road; Noi Bai International Airport; the National Exhibition Center in Dong Anh, inaugurated in August 2025, which now hosts large national trade fairs and events.
  • Under construction: the North Hanoi Smart City itself; Vinhomes Global Gate, the large Vinhomes township next to the exhibition centre, where low-rise zones have been in the finishing stage and further high-rise phases are being built; and Tu Lien Bridge, which will link Tay Ho directly to Dong Anh and is targeted for completion by the end of 2027.
  • Planned: further Red River bridges such as Tran Hung Dao Bridge, the extension of Hanoi’s urban railway network to the north and to Noi Bai, and the wider northern city defined in the 2045 master plan.

Within Vinhomes Global Gate, one of the high-rise projects is Masterise Homes’ Masteri Grand Avenue, a two-tower apartment development whose handover has been reported for 2027. As with any off-plan project, confirm its current construction stage and sale documents directly before committing.

Concept aerial rendering of Dong Anh north of the Red River with Nhat Tan Bridge in the foreground

What this means for people looking at property

The Smart City is a long-term project. Even on the current schedule, full completion is six years away, and the first phases will be infrastructure rather than homes. For people who need somewhere to live in the next few years, Dong Anh today offers newer townships with growing services, while established areas such as Tay Ho, Ciputra and the city centre remain the practical choice for most expatriates who want schools, shops and a short commute.

If you are considering an off-plan purchase in the north, buy what makes sense on its own terms rather than relying on the Smart City to raise values, and check the developer’s legal documents and foreign ownership quota carefully. Our foreigner’s guide to owning property in Vietnam explains the process, and our list of apartment buildings in Hanoi lets you compare completed buildings across the city.

Frequently Asked Questions

Who is developing the Smart City in Dong Anh?

North Hanoi Smart City Development Investment JSC, a joint venture between BRG Group and Sumitomo Corporation. Total investment is reported at about 4.2 billion USD on roughly 272 hectares.

Has construction of the Smart City started?

Yes. After an initial ceremony in 2019 and years of delays, the project broke ground again on 19 August 2025. Work in 2026 is at an early infrastructure stage, and no homes have been completed.

When will the Smart City be finished?

The project is split into five phases, with the last phase scheduled for the fourth quarter of 2032. Timelines may still change, including because of the pending decision on population size.

Will the 108-storey tower be built?

It remains in the plan as the project’s financial tower, reported at around 639 metres. It has not been built yet, and its design and schedule depend on later phases.

Can I buy an apartment in the Smart City now?

We have not seen an official announcement that residential units are eligible for sale. Before paying any deposit, ask for the housing authority’s written confirmation of eligibility for sale and the other documents required by law.

1/5 - (1 vote)

Share on social: 

You may also like reading:

Start Your
Property Search

From newly launched developments to high-quality existing homes, find properties that match your lifestyle and investment goals.

Top Investment
Locations

Explore the most sought-after locations in Hanoi, popular among foreign buyers and investors for their prime positioning, vibrant lifestyle, and strong growth potential.

Discover More

Whether you are looking for stable rental income or long-term capital growth, explore curated properties aligned with your investment strategy.

Compare Listings